Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13705862

- Product Categories
- Friendly Links
Information Name: | Eco pervious concrete |
Published: | 2015-04-20 |
Validity: | 30 |
Specifications: | |
Quantity: | 999999.00 |
Price Description: | |
Detailed Product Description: | Art Floor characteristics also called die floor, embossed floor, is the use of special wear-resistant mineral aggregate, high-grade cement, inorganic pigments and colored synthetic polymer additives floor hardeners, through die, sorting, sealing Construction of the concrete surface treatment technology to produce extraordinary stone texture and rich color effects. █ art embossed floor with a wear-resistant, corrosion-resistant, dense, compression, bending, not dust, colored embossed art performance █ ground floor has increased oil repellency, easy to pollution, high density, easy to clean, anti-infiltration █ art embossed floor has easy construction, fast curing, long life, easy maintenance █ art embossed floor with a cost-effective, wide choices, a wide range of applications, economical and practical choice for flooring in public R & D Applications █ municipal engineering: streets, sidewalks, road isolation zone, theme parks, cultural plaza, landscape engineering █ business: commercial buildings, hotels, restaurants, bars, shopping malls, convention centers, supermarkets, shops, parking █ housing: apartments, villas , residential areas, courtyards, gardens █ *: parks, playgrounds, water features, swimming pool █ Other: industrial plants, schools, kindergartens, public transportation system platform, real estate interior and exterior construction process Art Floor die floor embossed floor Concrete construction requirements for grassroots grassroots strength 1. Concrete shall ≤c25, its water-cement ratio as small as possible and must not contain rammed early strength agent. The largest bone ≤30mm 2. concrete aggregate size is appropriate, and the basis of the surface layer must be paved with gravel aggregate grain ≤15mm ≥10mm cement mortar layer thickness. 3. slump concrete should be controlled in 3-4cm, slump concrete products should be controlled in 12-14cm 4. gravel, prime land base must be approved by rolling compaction or compaction. 5.10cm following concrete vibrators vibrators vibrator use flatbed operations, 10cm above the concrete using a plug-in vibrators jobs. 6 using heavier steel long roll (steel roller should be wider than 0.3 meters above template) repeatedly rolling platform, make floor level. When rolling platform, foreign body should be divisible steel rollers. Will propose concrete slurry to ensure that there is no gravel surface phenomenon, can not be used in steel roller job site, should be scraped off the floor level model. After completing seven concrete floor level, water should be bleeding. 8 gradation requirements of the underlying concrete is C25 or C20, the upper for mortar C30 or C25 fine aggregate concrete, the total thickness of the concrete surface 5-20cm construction 1. nap treatment: Before the concrete surface grout with initial setting plus 1cm Hand iron concrete surface water mortar uniform surface leveling and nap. 2. Spreading hardening material: two-thirds of the prescribed amount of hardener die ground floor spreading evenly in the initial setting stage of the concrete surface to be wetted absorbent material hardening iron hand after leveling received light to complete the job the first time, be hardening material to a certain stage the initial setting stage, and then a second one-third received light leveling material dispensing operation. 3 leveling received light hardening material: According hardened concrete situation, the implementation of at least three times more iron handmade collection of light leveling jobs and income mutual light operation should be staggered. 4. Spreading stripping powder: a certain stage in the initial setting of hardened material, the surface is dry no circumstances under significant moisture evenly spreading a layer of hardened material supporting the mold powder. 5. suppress mold pattern, maintain a fixed mold formation, can not suppress the pattern to be a molding pressure. 6. Implement a variety of design styles, textures and colors. Ping Ping conservation and construction materials to the general requirements of a hardened die outdoors, should be prevented in the rain and strong winds carried the construction environment temperature is generally more than 2 degrees. 2 Rinse floor surface: hardened die floor to be completely dry for at least 2-3 days before forming solidified water or detergent to clean the surface, the surface must be cleaned to ensure the entire ground floor cleaning extent consistent, otherwise it will not cause ground shades One. 3. coating curing agent: hardened die floor to be cleaned surface is completely dry bath water no more than a day after at least before applying a liquid curing agent, hardened die-slip floor surface pollution and strengthen again. After the completion of hardening die floor in addition to good decorative than its physical properties are also very stable. 4 hardened die floor curing phase must prevent people just out of construction operations or other projects |
Admin>>>
You are the 67252 visitor
Copyright © GuangDong ICP No. 10089450, Hope Stone Landscape Engineering Co., Ltd. Shanghai All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 67252 visitor
Copyright © GuangDong ICP No. 10089450, Hope Stone Landscape Engineering Co., Ltd. Shanghai All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility